On Saturday, June 30 I made a fast trip to Whatcom County to meet with the "floor guy". All the in-floor plumbing is in including the tubes for the hot water radiant heat system. The picture below shows that we are ready to pour the interior floor and the patio around two sides. From talking to the floor guy, forming a fully finished floor is done over two periods: this week four/five inches of concete inside and out will be poured and prepared for work later. While the rest of the construction goes on, the floor will be protected with pads. When the other interior finish work is being done, the floor guy will come back and work his artistic magic to score, stain and polish. We have selected a gray-slate green color with scoring in a four foot grid. The pattern will be subtle involving in addition to a base color some black and two other shades of green.
warm on the toes!!!